PARAMOUNT SOLAR

MOULVIBAZAR SOLAR POWER LIMITED

Project Overview

The MOULVIBAZAR SOLAR POWER LIMITED is a 10mw ac / 14 mwp dc 10 mw (ac) grid-tied solar power plantlocated in Athangiri, Kagabala, Moulvibazar Sadar. This project represents a significant step forward in Bangladesh's renewable energy infrastructure, contributing to the nation's sustainable development goals.

Project Significance

  • Contributing to national renewable energy targets
  • Reducing dependency on fossil fuels
  • Creating local employment opportunities
  • Supporting sustainable development goals

Community Impact

  • Local job creation during construction and operation
  • Skills development and technical training
  • Improved regional energy security
  • Environmental benefits for local communities

Project Gallery

1 / 7
MOULVIBAZAR SOLAR POWER LIMITED - Image 1

Key Features & Technology

Advanced PV Technology

Utilizing high-efficiency solar panels with smart grid integration

Grid Stability

Integrated power management systems for reliable energy supply

Environmental Impact

Clean energy generation contributing to carbon reduction goals

Economic Benefits

Supporting local economy and creating sustainable energy infrastructure

Technical Specifications

System Components

panels:23,544 pcs LONGi Hi-MO 7 @ 600–605 W · 22.4% efficiency · 27 modules/string · 54 modules/table · 436 tables total
inverters:50 × Huawei 300 kW string inverters · 1300 Vdc → 800 Vac · 6 MPPT · 99% efficiency · THD 1%
tracking:Fixed shed, south-faced @ 18° tilt · POWERWAY structure · PHC piles 7 m (4 m depth) · 6.65 m pitch-to-pitch
transmission:16 km, 33 kV overhead OPGW line · Main S/S: 33 kV 17 MVA AIS · Power evacuation: 33/11 kV Bejbari Substation
monitoring:24 × 7 real-time SCADA monitoring · 2 weather stations · Huawei smart management system
maintenance:Own EPC & O&M team · 38 staff post-COD (14 electrical, 10 PV cleaning, 9 security) · dedicated cleaning & security

Performance Metrics

21.2 GWh / year
Annual Electricity Generation
53,000+
Households Powered
13,183 MT CO₂ / year
CO₂ Reduction

Project at a Glance

StatusOperational
Capacity10MW AC / 14 MWp DC
Commissioned12 January 2026
Land Area36 Acres
DeveloperParamount Solar Ltd.

Location

Athangiri, Kagabala, Moulvibazar Sadar
Coordinates: 24.4937°N, 91.6333°E

Environmental Impact

13,183 MT / year
CO₂ Saved
Project-basis carbon saving per year
14,246 tonnes / year
CO₂e Saved
GHG displacement vs. diesel-based generation
6.4 M litres / year
Diesel Displaced
Equivalent diesel fuel displaced annually
USD 5.00 M / year
Fuel Cost Saving
Annual fuel cost saving at USD 0.94/L diesel

Project Timeline

Jun 2024
PPA contract signed with BPDB (PPA No. 10710)
Sep 2024
First pile drive & land acquisition commenced
Sep 2025
MMS, PV module & transformer installation + testing
Nov 2025
33 kV line energised & back-feed from grid (27 Nov 2025)
Jan 2026
Commercial Operation Date declared by PDB (12 Jan 2026)

Interested in Learning More?

Contact our project team for detailed technical specifications, investment opportunities, or partnership inquiries about the MOULVIBAZAR SOLAR POWER LIMITED.